Westwing Substation substation interconnection queue

5 active projects totaling 1,775 MW in the APS queue.

5 APS queue filings name Westwing Substation as the point of interconnection, all in Maricopa County, AZ.

5active projects
1,775active MW
5total filed
Queue IDProjectkVMWResourceStatus
Q468 Not reported 500 1,000 Battery Active
Q280 Not reported 230 300 Battery Active
Q292 Not reported 230 200 Battery Operational
Q299 Not reported 69 150 Battery Active
Q384 Not reported 69 125 Battery Suspended

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with APS before relying on these figures.