Tat Momoli- Saguaro Line substation interconnection queue

2 active projects totaling 593 MW in the APS queue.

2 APS queue filings name Tat Momoli- Saguaro Line as the point of interconnection, all in Pinal County, AZ.

2active projects
593active MW
2total filed
Queue IDProjectkVMWResourceStatus
Q388 Not reported 230 323 Hybrid Active
Q392 Not reported 230 270 Hybrid Active

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with APS before relying on these figures.