0 active projects
totaling 0 MW in the APS queue, plus 4 with terminal status (shown grayed).
4 APS queue filings name Proposed Delany Switchyard as the point of interconnection, all in Maricopa County, AZ.
0active projects
0active MW
4total filed
Queue ID
Project
kV
MW
Resource
Status
Q57
Not reported
n/r
900
Solar
Withdrawn
Q42
Not reported
n/r
500
Solar
Withdrawn
Q56
Not reported
n/r
300
Solar
Withdrawn
Q30
Not reported
n/r
110
Solar
Withdrawn
A request with terminal status left the queue as filed.
That is a record of the filing, not evidence of injection capacity at this location.
Confirm deliverability with APS before relying on these figures.