Proposed Delany Switchyard substation interconnection queue

0 active projects totaling 0 MW in the APS queue, plus 4 with terminal status (shown grayed).

4 APS queue filings name Proposed Delany Switchyard as the point of interconnection, all in Maricopa County, AZ.

0active projects
0active MW
4total filed
Queue IDProjectkVMWResourceStatus
Q57 Not reported n/r 900 Solar Withdrawn
Q42 Not reported n/r 500 Solar Withdrawn
Q56 Not reported n/r 300 Solar Withdrawn
Q30 Not reported n/r 110 Solar Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with APS before relying on these figures.