Substation Scout

Proposed Delaney Switchyard substation interconnection queue

0 active projects totaling 0 MW in the APS queue, plus 2 with terminal status (shown grayed).

2 APS queue filings name Proposed Delaney Switchyard as the point of interconnection, all in Maricopa County, AZ.

0active projects
0active MW
2total filed
Queue IDProjectkVMWResourceStatus
Q39 Not reported n/r 800 Solar Withdrawn
Q38 Not reported n/r 400 Solar Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with APS before relying on these figures.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first