Moenkopi Substation substation interconnection queue

2 active projects totaling 1,250 MW in the APS queue, plus 2 with terminal status (shown grayed).

4 APS queue filings name Moenkopi Substation as the point of interconnection, all in Coconino County, AZ.

2active projects
1,250active MW
4total filed
Queue IDProjectkVMWResourceStatus
Q317 Not reported 500 750 Hybrid Active
Q312 Not reported 500 500 Solar Active
Q364 Not reported 500 500 Hybrid Withdrawn
Q532 Not reported 500 500 Hybrid Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with APS before relying on these figures.