Moenkopi- Eldorado line substation interconnection queue

0 active projects totaling 0 MW in the APS queue, plus 2 with terminal status (shown grayed).

2 APS queue filings name Moenkopi- Eldorado line as the point of interconnection, all in AZ.

0active projects
0active MW
2total filed
Queue IDProjectkVMWResourceStatus
Q26 Not reported 500 500 Wind Withdrawn
Q533 Not reported 500 500 Hybrid Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with APS before relying on these figures.