Substation Scout

Moenkopi - El Dorado line substation interconnection queue

1 active project totaling 700 MW in the APS queue, plus 1 with terminal status (shown grayed).

2 APS queue filings name Moenkopi - El Dorado line as the point of interconnection, all in AZ.

1active projects
700active MW
2total filed
Queue IDProjectkVMWResourceStatus
Q401 Not reported 500 700 Hybrid Active
Q512 Not reported 500 700 Other Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with APS before relying on these figures.