Substation Scout

Milligan Substation substation interconnection queue

4 active projects totaling 630 MW in the APS queue, plus 1 with terminal status (shown grayed).

5 APS queue filings name Milligan Substation as the point of interconnection, all in Pinal County, AZ.

4active projects
630active MW
5total filed
Queue IDProjectkVMWResourceStatus
Q295 Not reported 230 250 Hybrid Active
Q587 Not reported n/r 150 Other Active
Q264 Not reported 230 130 Hybrid Active
Q336 Not reported 69 125 Hybrid Withdrawn
Q256 Not reported 69 100 Hybrid Active

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with APS before relying on these figures.