Substation Scout

Line Substation substation interconnection queue

0 active projects totaling 0 MW in the APS queue, plus 3 with terminal status (shown grayed).

3 APS queue filings name Line Substation as the point of interconnection, all in AZ.

0active projects
0active MW
3total filed
Queue IDProjectkVMWResourceStatus
Q143 Not reported 69 50 Solar Withdrawn
Q85 Not reported 69 20 Solar Withdrawn
Q108 Not reported 12 9.4 Solar Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with APS before relying on these figures.