Komatke substation interconnection queue

1 active project totaling 45 MW in the APS queue, plus 1 with terminal status (shown grayed).

2 APS queue filings name Komatke as the point of interconnection, all in Maricopa County, AZ.

1active projects
45active MW
2total filed
Queue IDProjectkVMWResourceStatus
Q473 Not reported 230 200 Hybrid Withdrawn
Q346 Not reported 69 45 Solar Suspended

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with APS before relying on these figures.