Substation Scout

El Sol substation interconnection queue

1 active project totaling 50 MW in the APS queue, plus 1 with terminal status (shown grayed).

2 APS queue filings name El Sol as the point of interconnection, all in Maricopa County, AZ.

1active projects
50active MW
2total filed
Queue IDProjectkVMWResourceStatus
Q412 Not reported 230 225 Battery Withdrawn
Q289 Not reported 69 50 Battery Active

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with APS before relying on these figures.