Delaney substation interconnection queue

5 active projects totaling 2,450 MW in the APS queue, plus 2 with terminal status (shown grayed).

5active projects
2,450active MW
7total filed
Queue IDProjectkVMWResourceStatus
Q499 Not reported 500 1,300 Hydro Withdrawn
Q474 Not reported 500 1,000 Hybrid Active
Q445 Not reported 500 647 Hybrid Withdrawn
Q360 Not reported 500 550 Hybrid Active
Q375 Not reported 500 300 Battery Active
Q389 Not reported 500 300 Hybrid Operational
Q467 Not reported 500 300 Battery Active

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with APS before relying on these figures.