Delaney Substation substation interconnection queue

1 active project totaling 500 MW in the APS queue, plus 4 with terminal status (shown grayed).

5 APS queue filings name Delaney Substation as the point of interconnection, all in Maricopa County, AZ.

1active projects
500active MW
5total filed
Queue IDProjectkVMWResourceStatus
Q580 Not reported 500 500 Other Active
Q184 Not reported 500 300 Solar Withdrawn
Q233 Not reported 500 300 Solar Withdrawn
Q248 Not reported 500 300 Hybrid Withdrawn
Q238 Not reported 69 177.9 Hybrid Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with APS before relying on these figures.