Substation Scout

APS Chevelon Substation substation interconnection queue

2 active projects totaling 999 MW in the APS queue, plus 1 with terminal status (shown grayed).

3 APS queue filings name APS Chevelon Substation as the point of interconnection, all in Coconino County, AZ.

2active projects
999active MW
3total filed
Queue IDProjectkVMWResourceStatus
Q538 Not reported 345 499.5 Wind Active
Q539 Not reported 345 499.5 Wind Active
SP113 Not reported 345 477 Battery Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with APS before relying on these figures.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first