APS request Q617
APS queue ID Q617
Queue request Q617 was listed in the APS interconnection queue at the end of 2025 as a 1,000 MW project in Mohave County, AZ, according to Berkeley Lab’s queue data file. The filing names Approximate coordinates 33., - 113. as its point of interconnection. Its status as of December 31, 2025 was “Active”, with a proposed online date of May 1, 2031.
| Queue ID | Q617 |
|---|---|
| Project name | Not reported |
| Status (as published) | Active |
| Substation | Approximate coordinates 33., - 113. |
| Point of interconnection | Approximate coordinates 33.541418, - 113.045095 |
| County | Mohave |
| State | AZ |
| Voltage | Not reported |
| Capacity | 1,000 MW |
| Resource (as published) | Other |
| Resource category | Other (normalized for filtering) |
| Proposed online date | 2031-05-01 |
| Source dataset | Berkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025 |
Same substation and county
Mohave, AZ: 5 requests in the APS queue, 1 active totaling 1,000 MW.
Tracked changes
Not tracked. APS rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.
Additional filed fields
| Utility | Arizona Public Service |
|---|---|
| Interconnection service | NRIS |
| Project type | Generation |
| Study phase (standardized by Berkeley Lab) | Cluster Study |
| Study phase (as the queue printed it) | Phase 1 Cluster Study |
| Queue date | 2025-05-21 |
Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.