APS request Q582

APS queue ID Q582

Queue request Q582 was listed in the APS interconnection queue at the end of 2025 as a 275 MW project in Maricopa County, AZ, according to Berkeley Lab’s queue data file. The filing names New Switchyard on the Palo Verde - Delaney Line as its point of interconnection. Its status as of December 31, 2025 was “Active”, with a proposed online date of December 31, 2030.

Queue IDQ582
Project nameNot reported
Status (as published)Active
SubstationNew Switchyard on the Palo Verde - Delaney Line
Point of interconnectionNew Switchyard on the Palo Verde - Delaney 500 kV Line
CountyMaricopa
StateAZ
Voltage500 kV
Capacity275 MW
Resource (as published)Other
Resource categoryOther (normalized for filtering)
Proposed online date2030-12-31
Source datasetBerkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025

Same substation and county

Maricopa, AZ: 259 requests in the APS queue, 82 active totaling 24,048 MW.

Tracked changes

Not tracked. APS rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.

Additional filed fields

UtilityArizona Public Service
Interconnection serviceNRIS
Project typeGeneration
Study phase (standardized by Berkeley Lab)Cluster Study
Study phase (as the queue printed it)Phase 1 Cluster Study
Queue date2025-05-07

Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.

Fields shown are those in Berkeley Lab’s data file, which standardizes each provider’s queue. The provider’s own queue may carry more fields and newer values. Always confirm against it before relying on any value.