APS request Q553

APS queue ID Q553

Queue request Q553 was listed in the APS interconnection queue at the end of 2025 as a 340 MW project in Navajo County, AZ, according to Berkeley Lab’s queue data file. The filing names Sitgreaves substation as its point of interconnection. Its status as of December 31, 2025 was “Active”, with a proposed online date of December 31, 2028.

Queue IDQ553
Project nameNot reported
Status (as published)Active
SubstationSitgreaves substation
Point of interconnectionSitgreaves substation
CountyNavajo
StateAZ
VoltageNot reported
Capacity340 MW
Resource (as published)Other
Resource categoryOther (normalized for filtering)
Proposed online date2028-12-31
Source datasetBerkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025

Same substation and county

Sitgreaves substation substation: 3 requests in the APS queue, 2 active totaling 840 MW.

Queue IDProjectMWResourceStatus
Q311Not reported500HybridActive
Q556Not reported160OtherWithdrawn

Navajo, AZ: 65 requests in the APS queue, 26 active totaling 7,906.4 MW.

Tracked changes

Not tracked. APS rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.

Additional filed fields

UtilityArizona Public Service
Interconnection serviceNRIS
Project typeGeneration
Study phase (standardized by Berkeley Lab)Cluster Study
Study phase (as the queue printed it)Phase 1 Cluster Study
Queue date2024-05-02

Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.

Fields shown are those in Berkeley Lab’s data file, which standardizes each provider’s queue. The provider’s own queue may carry more fields and newer values. Always confirm against it before relying on any value.