Substation Scout

APS request Q518

APS queue ID Q518

Queue request Q518 was listed in the APS interconnection queue at the end of 2025 as a 70 MW battery project in Yuma County, AZ, according to Berkeley Lab’s queue data file. The filing names Desert Sands Substation as its point of interconnection. Its status as of December 31, 2025 was “Active”, with a proposed online date of April 1, 2023.

Queue IDQ518
Project nameNot reported
Status (as published)Active
SubstationDesert Sands Substation
Point of interconnectionDesert Sands Substation
CountyYuma
StateAZ
VoltageNot reported
Capacity70 MW
Resource (as published)Battery
Resource categoryBattery (normalized for filtering)
Proposed online date2023-04-01
Source datasetBerkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025

Same substation and county

Yuma, AZ: 84 requests in the APS queue, 26 active totaling 6,573.1 MW.

Tracked changes

Not tracked. APS rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.

Additional filed fields

UtilityArizona Public Service
Interconnection serviceNRIS
Project typeGeneration
Study phase (standardized by Berkeley Lab)Facility Study
Study phase (as the queue printed it)Transitional Cluster: Phase 4 Facilities Study
Queue date2023-03-30

Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.

Fields shown are those in Berkeley Lab’s data file, which standardizes each provider’s queue. The provider’s own queue may carry more fields and newer values. Always confirm against it before relying on any value.