APS queue ID Q507

Queue request Q507 was listed in the APS interconnection queue at the end of 2025 as a 400 MW hybrid project in Maricopa County, AZ, according to Berkeley Lab’s queue data file. The filing names Panda-Freedom line as its point of interconnection. Its status as of December 31, 2025 was “Active”, with a proposed online date of June 1, 2028.

Queue IDQ507
Project nameNot reported
Status (as published)Active
SubstationPanda-Freedom line
Point of interconnectionPanda-Freedom 230kV line
CountyMaricopa
StateAZ
Voltage230 kV
Capacity400 MW
Resource (as published)Solar+Battery
Resource categoryHybrid (normalized for filtering)
Proposed online date2028-06-01
Source datasetBerkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025

Same substation and county

Maricopa, AZ: 259 requests in the APS queue, 82 active totaling 24,048 MW.

Tracked changes

Not tracked. APS rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.

Additional filed fields

UtilityArizona Public Service
Interconnection serviceNRIS
Project typeGeneration
Study phase (standardized by Berkeley Lab)Cluster Study
Study phase (as the queue printed it)Transitional Cluster: Cluster Study (Phase 2 - Results Meeting)
Queue date2023-03-31
Components (hybrid)Solar 400 MW + Battery

Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.

Fields shown are those in Berkeley Lab’s data file, which standardizes each provider’s queue. The provider’s own queue may carry more fields and newer values. Always confirm against it before relying on any value.