APS request Q475

APS queue ID Q475

Queue request Q475 was listed in the APS interconnection queue at the end of 2025 as a 250 MW hybrid project in Maricopa County, AZ, according to Berkeley Lab’s queue data file. The filing names Delaney (Q437 Gen Tie) as its point of interconnection. Its status as of December 31, 2025 was “Active”, with a proposed online date of December 31, 2025.

Queue IDQ475
Project nameNot reported
Status (as published)Active
SubstationDelaney (Q437 Gen Tie)
Point of interconnectionDelaney 500kV (Q437 Gen Tie)
CountyMaricopa
StateAZ
Voltage500 kV
Capacity250 MW
Resource (as published)Solar+Battery
Resource categoryHybrid (normalized for filtering)
Proposed online date2025-12-31
Source datasetBerkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025

Same substation and county

Maricopa, AZ: 259 requests in the APS queue, 82 active totaling 24,048 MW.

Tracked changes

Not tracked. APS rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.

Additional filed fields

UtilityArizona Public Service
Interconnection serviceERIS
Project typeGeneration
Study phase (standardized by Berkeley Lab)Facility Study
Study phase (as the queue printed it)Transitional Cluster: Phase 4 Facilities Study
Queue date2022-03-31
Components (hybrid)Solar 250 MW + Battery

Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.

Fields shown are those in Berkeley Lab’s data file, which standardizes each provider’s queue. The provider’s own queue may carry more fields and newer values. Always confirm against it before relying on any value.