Queue request Q442 was listed in the APS interconnection queue at the end of 2025 as a 200 MW hybrid project in Yuma County, AZ, according to Berkeley Lab’s queue data file. The filing names HANGI line as its point of interconnection. Its status as of December 31, 2025 was “Active”, with a proposed online date of December 31, 2026.

Queue IDQ442
Project nameNot reported
Status (as published)Active
SubstationHANGI line
Point of interconnectionHANGI 500kV line
CountyYuma
StateAZ
Voltage500 kV
Capacity200 MW
Resource (as published)Solar+Battery
Resource categoryHybrid (normalized for filtering)
Proposed online date2026-12-31
Source datasetBerkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025

Same substation and county

Yuma, AZ: 84 requests in the APS queue, 26 active totaling 6,573.1 MW.

Tracked changes

Not tracked. APS rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.

Additional filed fields

UtilityArizona Public Service
Interconnection serviceERIS
Project typeGeneration
Study phase (standardized by Berkeley Lab)Facility Study
Study phase (as the queue printed it)Transitional Cluster: Phase 4 Facilities Study
Queue date2022-03-21
Components (hybrid)Solar 200 MW + Battery

Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.

Fields shown are those in Berkeley Lab’s data file, which standardizes each provider’s queue. The provider’s own queue may carry more fields and newer values. Always confirm against it before relying on any value.