Queue request Q427 was listed in the APS interconnection queue at the end of 2025 as a 250 MW battery project in Maricopa County, AZ, according to Berkeley Lab’s queue data file. The filing names Freedom Switchyard as its point of interconnection. Its status as of December 31, 2025 was “Active”, with a proposed online date of May 1, 2025.
| Queue ID | Q427 |
|---|---|
| Project name | Not reported |
| Status (as published) | Active |
| Substation | Freedom Switchyard |
| Point of interconnection | Freedom 230KV Switchyard |
| County | Maricopa |
| State | AZ |
| Voltage | 230 kV |
| Capacity | 250 MW |
| Resource (as published) | Battery |
| Resource category | Battery (normalized for filtering) |
| Proposed online date | 2025-05-01 |
| Source dataset | Berkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025 |
Same substation and county
Maricopa, AZ: 259 requests in the APS queue, 82 active totaling 24,048 MW.
Tracked changes
Not tracked. APS rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.
Additional filed fields
| Utility | Arizona Public Service |
|---|---|
| Interconnection service | NRIS |
| Project type | Generation |
| Study phase (standardized by Berkeley Lab) | Facility Study |
| Study phase (as the queue printed it) | Transitional Cluster: Phase 4 Facilities Study |
| Queue date | 2021-09-30 |
Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.