Substation Scout

APS request Q393

APS queue ID Q393

Queue request Q393 was listed in the APS interconnection queue at the end of 2025 as a 500 MW hybrid project in Coconino County, AZ, according to Berkeley Lab’s queue data file. The filing names Cedar Mountain- Moenkopi line as its point of interconnection. Its status as of December 31, 2025 was “Active”, with a proposed online date of December 31, 2024.

Queue IDQ393
Project nameNot reported
Status (as published)Active
SubstationCedar Mountain- Moenkopi line
Point of interconnectionCedar Mountain- Moenkopi 500 kV line
CountyCoconino
StateAZ
Voltage500 kV
Capacity500 MW
Resource (as published)Solar+Battery
Resource categoryHybrid (normalized for filtering)
Proposed online date2024-12-31
Source datasetBerkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025

Same substation and county

Coconino, AZ: 52 requests in the APS queue, 17 active totaling 8,253.7 MW.

Tracked changes

Not tracked. APS rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.

Additional filed fields

UtilityArizona Public Service
Interconnection serviceNRIS
Project typeGeneration
Study phase (standardized by Berkeley Lab)Cluster Study
Study phase (as the queue printed it)Transitional Cluster: Cluster Study (Phase 2)
Queue date2021-03-31
Components (hybrid)Solar 500 MW + Battery

Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.

Fields shown are those in Berkeley Lab’s data file, which standardizes each provider’s queue. The provider’s own queue may carry more fields and newer values. Always confirm against it before relying on any value.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first