APS queue ID Q370

Queue request Q370 was listed in the APS interconnection queue at the end of 2025 as a 309.7 MW wind project in Coconino County, AZ, according to Berkeley Lab’s queue data file. The filing names Moenkopi-Cedar Mtn as its point of interconnection. Its status as of December 31, 2025 was “Active”, with a proposed online date of December 15, 2024.

Queue IDQ370
Project nameNot reported
Status (as published)Active
SubstationMoenkopi-Cedar Mtn
Point of interconnectionMoenkopi-Cedar Mtn 500 kV
CountyCoconino
StateAZ
Voltage500 kV
Capacity309.7 MW
Resource (as published)Wind
Resource categoryWind (normalized for filtering)
Proposed online date2024-12-15
Source datasetBerkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025

Same substation and county

Coconino, AZ: 52 requests in the APS queue, 17 active totaling 8,253.7 MW.

Tracked changes

Not tracked. APS rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.

Additional filed fields

UtilityArizona Public Service
Interconnection serviceERIS
Project typeGeneration
Study phase (standardized by Berkeley Lab)Cluster Study
Study phase (as the queue printed it)Transitional Cluster: Cluster Study (Phase 2)
Queue date2021-03-30

Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.

Fields shown are those in Berkeley Lab’s data file, which standardizes each provider’s queue. The provider’s own queue may carry more fields and newer values. Always confirm against it before relying on any value.