APS request Q352
APS queue ID Q352
Queue request Q352 was listed in the APS interconnection queue at the end of 2025 as a 450 MW hybrid project in Navajo County, AZ, according to Berkeley Lab’s queue data file. The filing names Sitgreaves as its point of interconnection. Its status as of December 31, 2025 was “Active”, with a proposed online date of November 30, 2023.
| Queue ID | Q352 |
|---|---|
| Project name | Not reported |
| Status (as published) | Active |
| Substation | Sitgreaves |
| Point of interconnection | Sitgreaves 345 kV |
| County | Navajo |
| State | AZ |
| Voltage | 345 kV |
| Capacity | 450 MW |
| Resource (as published) | Solar+Battery |
| Resource category | Hybrid (normalized for filtering) |
| Proposed online date | 2023-11-30 |
| Source dataset | Berkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025 |
Same substation and county
Navajo, AZ: 65 requests in the APS queue, 26 active totaling 7,906.4 MW.
Tracked changes
Not tracked. APS rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.
Additional filed fields
| Utility | Arizona Public Service |
|---|---|
| Interconnection service | ERIS |
| Project type | Generation |
| Study phase (standardized by Berkeley Lab) | Cluster Study |
| Study phase (as the queue printed it) | Transitional Cluster: Phase 3 (Re-Study) |
| Queue date | 2020-09-28 |
| Components (hybrid) | Solar 450 MW + Battery |
Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.
Fields shown are those in Berkeley Lab’s data file, which standardizes each provider’s queue. The provider’s own queue may carry more fields and newer values. Always confirm against it before relying on any value.