Substation Scout

APS request Q302

APS queue ID Q302

Queue request Q302 was listed in the APS interconnection queue at the end of 2025 as a 16 MW battery project in Yuma County, AZ, according to Berkeley Lab’s queue data file. The filing names Line as its point of interconnection. Its status as of December 31, 2025 was “Operational”, with a proposed online date of May 1, 2022.

Queue IDQ302
Project nameNot reported
Status (as published)Operational
SubstationLine
Point of interconnectionLine 12kV
CountyYuma
StateAZ
Voltage12 kV
Capacity16 MW
Resource (as published)Battery
Resource categoryBattery (normalized for filtering)
Proposed online date2022-05-01
Source datasetBerkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025

Same substation and county

Line substation: 2 requests in the APS queue, 2 active totaling 30 MW.

Queue IDProjectMWResourceStatus
Q303Not reported14BatteryOperational

Yuma, AZ: 84 requests in the APS queue, 26 active totaling 6,573.1 MW.

Tracked changes

Not tracked. APS rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.

Additional filed fields

UtilityArizona Public Service
Interconnection serviceNRIS
Project typeGeneration
Study phase (standardized by Berkeley Lab)IA Executed
Study phase (as the queue printed it)In-Service
Queue date2019-03-29

Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.

Fields shown are those in Berkeley Lab’s data file, which standardizes each provider’s queue. The provider’s own queue may carry more fields and newer values. Always confirm against it before relying on any value.