APS request Q276
APS queue ID Q276
Queue request Q276 was listed in the APS interconnection queue at the end of 2025 as a 150 MW solar project in Maricopa County, AZ, according to Berkeley Lab’s queue data file. The filing names Delaney SY as its point of interconnection. Its status as of December 31, 2025 was “Operational”, with a proposed online date of April 1, 2022.
| Queue ID | Q276 |
|---|---|
| Project name | Not reported |
| Status (as published) | Operational |
| Substation | Delaney SY |
| Point of interconnection | Delaney 500kV SY |
| County | Maricopa |
| State | AZ |
| Voltage | 500 kV |
| Capacity | 150 MW |
| Resource (as published) | Solar |
| Resource category | Solar (normalized for filtering) |
| Proposed online date | 2022-04-01 |
| Source dataset | Berkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025 |
Same substation and county
Delaney SY substation: 2 requests in the APS queue, 2 active totaling 600 MW.
| Queue ID | Project | MW | Resource | Status |
|---|---|---|---|---|
| Q269 | Not reported | 450 | Battery | Active |
Maricopa, AZ: 259 requests in the APS queue, 82 active totaling 24,048 MW.
Tracked changes
Not tracked. APS rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.
Additional filed fields
| Utility | Arizona Public Service |
|---|---|
| Interconnection service | NRIS |
| Project type | Generation |
| Study phase (standardized by Berkeley Lab) | IA Executed |
| Study phase (as the queue printed it) | In-Service |
| Queue date | 2018-03-30 |
Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.
Fields shown are those in Berkeley Lab’s data file, which standardizes each provider’s queue. The provider’s own queue may carry more fields and newer values. Always confirm against it before relying on any value.