APS request Q273
APS queue ID Q273
Queue request Q273 was listed in the APS interconnection queue at the end of 2025 as a 477 MW wind project in Navajo County, AZ, according to Berkeley Lab’s queue data file. The filing names Preacher Canyon - Cholla as its point of interconnection. Its status as of December 31, 2025 was “Active”, with a proposed online date of December 21, 2021.
| Queue ID | Q273 |
|---|---|
| Project name | Not reported |
| Status (as published) | Active |
| Substation | Preacher Canyon - Cholla |
| Point of interconnection | Preacher Canyon - Cholla 345kV |
| County | Navajo |
| State | AZ |
| Voltage | 345 kV |
| Capacity | 477 MW |
| Resource (as published) | Wind |
| Resource category | Wind (normalized for filtering) |
| Proposed online date | 2021-12-21 |
| Source dataset | Berkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025 |
Same substation and county
Navajo, AZ: 65 requests in the APS queue, 26 active totaling 7,906.4 MW.
Tracked changes
Not tracked. APS rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.
Additional filed fields
| Utility | Arizona Public Service |
|---|---|
| Interconnection service | NRIS |
| Project type | Generation |
| Study phase (standardized by Berkeley Lab) | In Progress (unknown study) |
| Study phase (as the queue printed it) | Project with APS Project Manager (Legacy) |
| Queue date | 2018-03-30 |
Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.
Fields shown are those in Berkeley Lab’s data file, which standardizes each provider’s queue. The provider’s own queue may carry more fields and newer values. Always confirm against it before relying on any value.