APS request Q236/272
APS queue ID Q236/272
Queue request Q236/272 was listed in the APS interconnection queue at the end of 2025 as a 70 MW hybrid project in Yuma County, AZ, according to Berkeley Lab’s queue data file. The filing names Desert Sands Switchyard as its point of interconnection. Its status as of December 31, 2025 was “Operational”, with a proposed online date of March 23, 2021.
| Queue ID | Q236/272 |
|---|---|
| Project name | Not reported |
| Status (as published) | Operational |
| Substation | Desert Sands Switchyard |
| Point of interconnection | Desert Sands 69kV Switchyard |
| County | Yuma |
| State | AZ |
| Voltage | 69 kV |
| Capacity | 70 MW |
| Resource (as published) | Solar+Battery |
| Resource category | Hybrid (normalized for filtering) |
| Proposed online date | 2021-03-23 |
| Source dataset | Berkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025 |
Same substation and county
Yuma, AZ: 84 requests in the APS queue, 26 active totaling 6,573.1 MW.
Tracked changes
Not tracked. APS rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.
Additional filed fields
| Utility | Arizona Public Service |
|---|---|
| Interconnection service | NRIS |
| Project type | Generation |
| Study phase (standardized by Berkeley Lab) | IA Executed |
| Study phase (as the queue printed it) | In-Service |
| Queue date | 2016-03-30 |
| Components (hybrid) | Solar 70 MW + Battery |
Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.
Fields shown are those in Berkeley Lab’s data file, which standardizes each provider’s queue. The provider’s own queue may carry more fields and newer values. Always confirm against it before relying on any value.