Substation Scout

APS request Q236/272

APS queue ID Q236/272

Queue request Q236/272 was listed in the APS interconnection queue at the end of 2025 as a 70 MW hybrid project in Yuma County, AZ, according to Berkeley Lab’s queue data file. The filing names Desert Sands Switchyard as its point of interconnection. Its status as of December 31, 2025 was “Operational”, with a proposed online date of March 23, 2021.

Queue IDQ236/272
Project nameNot reported
Status (as published)Operational
SubstationDesert Sands Switchyard
Point of interconnectionDesert Sands 69kV Switchyard
CountyYuma
StateAZ
Voltage69 kV
Capacity70 MW
Resource (as published)Solar+Battery
Resource categoryHybrid (normalized for filtering)
Proposed online date2021-03-23
Source datasetBerkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025

Same substation and county

Yuma, AZ: 84 requests in the APS queue, 26 active totaling 6,573.1 MW.

Tracked changes

Not tracked. APS rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.

Additional filed fields

UtilityArizona Public Service
Interconnection serviceNRIS
Project typeGeneration
Study phase (standardized by Berkeley Lab)IA Executed
Study phase (as the queue printed it)In-Service
Queue date2016-03-30
Components (hybrid)Solar 70 MW + Battery

Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.

Fields shown are those in Berkeley Lab’s data file, which standardizes each provider’s queue. The provider’s own queue may carry more fields and newer values. Always confirm against it before relying on any value.