APS request Q229

APS queue ID Q229

Queue request Q229 was listed in the APS interconnection queue at the end of 2025 as a 50 MW battery project in Maricopa County, AZ, according to Berkeley Lab’s queue data file. The filing names El Sol Substation as its point of interconnection. Its status as of December 31, 2025 was “Active”, with a proposed online date of January 21, 2021.

Queue IDQ229
Project nameNot reported
Status (as published)Active
SubstationEl Sol Substation
Point of interconnectionEl Sol 69kV Substation
CountyMaricopa
StateAZ
Voltage69 kV
Capacity50 MW
Resource (as published)Battery
Resource categoryBattery (normalized for filtering)
Proposed online date2021-01-21
Source datasetBerkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025

Same substation and county

El Sol Substation substation: 2 requests in the APS queue, 1 active totaling 50 MW.

Queue IDProjectMWResourceStatus
Q188Not reported8SolarWithdrawn

Maricopa, AZ: 259 requests in the APS queue, 82 active totaling 24,048 MW.

Tracked changes

Not tracked. APS rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.

Additional filed fields

UtilityArizona Public Service
Interconnection serviceNRIS
Project typeGeneration
Study phase (standardized by Berkeley Lab)In Progress (unknown study)
Study phase (as the queue printed it)Customer Submited Commercial Operation Date
Queue date2015-09-30

Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.

Fields shown are those in Berkeley Lab’s data file, which standardizes each provider’s queue. The provider’s own queue may carry more fields and newer values. Always confirm against it before relying on any value.