Substation Scout

APS request Q213

APS queue ID Q213

Queue request Q213 was listed in the APS interconnection queue at the end of 2025 as a 3 MW solar project in Yuma County, AZ, according to Berkeley Lab’s queue data file. The filing names Desert Sands switchyard as its point of interconnection. Its status as of December 31, 2025 was “Operational”, with a proposed online date of December 19, 2012.

Queue IDQ213
Project nameNot reported
Status (as published)Operational
SubstationDesert Sands switchyard
Point of interconnectionDesert Sands 69kv switchyard
CountyYuma
StateAZ
Voltage69 kV
Capacity3 MW
Resource (as published)Solar
Resource categorySolar (normalized for filtering)
Proposed online date2012-12-19
Source datasetBerkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025

Same substation and county

Desert Sands switchyard substation: 3 requests in the APS queue, 2 active totaling 38 MW.

Queue IDProjectMWResourceStatus
Q205Not reported35SolarOperational
Q217Not reported35SolarWithdrawn

Yuma, AZ: 84 requests in the APS queue, 26 active totaling 6,573.1 MW.

Tracked changes

Not tracked. APS rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.

Additional filed fields

UtilityArizona Public Service
Interconnection serviceNRIS
Project typeGeneration
Study phase (standardized by Berkeley Lab)IA Executed
Study phase (as the queue printed it)In-Service
Queue date2012-05-15

Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.

Fields shown are those in Berkeley Lab’s data file, which standardizes each provider’s queue. The provider’s own queue may carry more fields and newer values. Always confirm against it before relying on any value.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first