APS queue ID Q202

Queue request Q202 was listed in the APS interconnection queue at the end of 2025 as a 30 MW solar project in Navajo County, AZ, according to Berkeley Lab’s queue data file. The filing names Conley Sub as its point of interconnection. Its status as of December 31, 2025 was “Operational”, with a proposed online date of September 16, 2021.

Queue IDQ202
Project nameNot reported
Status (as published)Operational
SubstationConley Sub
Point of interconnectionConley Sub 69 kV
CountyNavajo
StateAZ
Voltage69 kV
Capacity30 MW
Resource (as published)Solar
Resource categorySolar (normalized for filtering)
Proposed online date2021-09-16
Source datasetBerkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025

Same substation and county

Navajo, AZ: 65 requests in the APS queue, 26 active totaling 7,906.4 MW.

Tracked changes

Not tracked. APS rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.

Additional filed fields

UtilityArizona Public Service
Interconnection serviceERIS
Project typeGeneration
Study phase (standardized by Berkeley Lab)IA Executed
Study phase (as the queue printed it)In-Service
Queue date2011-07-22

Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.

Fields shown are those in Berkeley Lab’s data file, which standardizes each provider’s queue. The provider’s own queue may carry more fields and newer values. Always confirm against it before relying on any value.