APS queue ID Q20

Queue request Q20 was listed in the APS interconnection queue at the end of 2025 as a 2,334 MW gas project in Maricopa County, AZ, according to Berkeley Lab’s queue data file. The filing names Gila River as its point of interconnection. Its status as of December 31, 2025 was “Operational”.

Queue IDQ20
Project nameNot reported
Status (as published)Operational
SubstationGila River
Point of interconnectionGila River 500kv
CountyMaricopa
StateAZ
Voltage500 kV
Capacity2,334 MW
Resource (as published)Gas
Resource categoryGas (normalized for filtering)
Proposed online dateNot reported
Source datasetBerkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025

Same substation and county

Maricopa, AZ: 259 requests in the APS queue, 82 active totaling 24,048 MW.

Tracked changes

Not tracked. APS rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.

Additional filed fields

UtilityArizona Public Service
Interconnection serviceERIS
Project typeGeneration
Study phase (standardized by Berkeley Lab)IA Executed
Study phase (as the queue printed it)In-Service
Queue date2005-09-30

Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.

Fields shown are those in Berkeley Lab’s data file, which standardizes each provider’s queue. The provider’s own queue may carry more fields and newer values. Always confirm against it before relying on any value.