APS request Q196
APS queue ID Q196
Queue request Q196 was listed in the APS interconnection queue at the end of 2025 as a 161 MW hybrid project in Coconino County, AZ, according to Berkeley Lab’s queue data file. The filing names Moenkopi-Cedar Mountain line as its point of interconnection. Its status as of December 31, 2025 was “Operational”, with a proposed online date of December 24, 2021.
| Queue ID | Q196 |
|---|---|
| Project name | Not reported |
| Status (as published) | Operational |
| Substation | Moenkopi-Cedar Mountain line |
| Point of interconnection | 500 kV Moenkopi-Cedar Mountain line |
| County | Coconino |
| State | AZ |
| Voltage | 500 kV |
| Capacity | 161 MW |
| Resource (as published) | Solar+Wind |
| Resource category | Hybrid (normalized for filtering) |
| Proposed online date | 2021-12-24 |
| Source dataset | Berkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025 |
Same substation and county
Coconino, AZ: 52 requests in the APS queue, 17 active totaling 8,253.7 MW.
Tracked changes
Not tracked. APS rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.
Additional filed fields
| Utility | Arizona Public Service |
|---|---|
| Interconnection service | ERIS |
| Project type | Generation |
| Study phase (standardized by Berkeley Lab) | IA Executed |
| Study phase (as the queue printed it) | In-Service |
| Queue date | 2011-05-05 |
| Components (hybrid) | Solar 161 MW + Wind |
Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.
Fields shown are those in Berkeley Lab’s data file, which standardizes each provider’s queue. The provider’s own queue may carry more fields and newer values. Always confirm against it before relying on any value.