APS request Q196

APS queue ID Q196

Queue request Q196 was listed in the APS interconnection queue at the end of 2025 as a 161 MW hybrid project in Coconino County, AZ, according to Berkeley Lab’s queue data file. The filing names Moenkopi-Cedar Mountain line as its point of interconnection. Its status as of December 31, 2025 was “Operational”, with a proposed online date of December 24, 2021.

Queue IDQ196
Project nameNot reported
Status (as published)Operational
SubstationMoenkopi-Cedar Mountain line
Point of interconnection500 kV Moenkopi-Cedar Mountain line
CountyCoconino
StateAZ
Voltage500 kV
Capacity161 MW
Resource (as published)Solar+Wind
Resource categoryHybrid (normalized for filtering)
Proposed online date2021-12-24
Source datasetBerkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025

Same substation and county

Coconino, AZ: 52 requests in the APS queue, 17 active totaling 8,253.7 MW.

Tracked changes

Not tracked. APS rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.

Additional filed fields

UtilityArizona Public Service
Interconnection serviceERIS
Project typeGeneration
Study phase (standardized by Berkeley Lab)IA Executed
Study phase (as the queue printed it)In-Service
Queue date2011-05-05
Components (hybrid)Solar 161 MW + Wind

Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.

Fields shown are those in Berkeley Lab’s data file, which standardizes each provider’s queue. The provider’s own queue may carry more fields and newer values. Always confirm against it before relying on any value.