Substation Scout

APS request Q007 - 061

APS queue ID Q007 - 061

Queue request Q007 - 061 was listed in the APS interconnection queue at the end of 2025 as a 24 MW project in Navajo County, AZ, according to Berkeley Lab’s queue data file. The filing names Zeniff Substation as its point of interconnection. Its status as of December 31, 2025 was “Operational”, with a proposed online date of April 1, 2008.

Queue IDQ007 - 061
Project nameNot reported
Status (as published)Operational
SubstationZeniff Substation
Point of interconnectionZeniff 69kV Substation
CountyNavajo
StateAZ
Voltage69 kV
Capacity24 MW
Resource (as published)Other
Resource categoryOther (normalized for filtering)
Proposed online date2008-04-01
Source datasetBerkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025

Same substation and county

Zeniff Substation substation: 2 requests in the APS queue, 1 active totaling 24 MW.

Queue IDProjectMWResourceStatus
Q546Not reported75HybridWithdrawn

Navajo, AZ: 65 requests in the APS queue, 26 active totaling 7,906.4 MW.

Tracked changes

Not tracked. APS rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.

Additional filed fields

UtilityArizona Public Service
Interconnection serviceERIS
Project typeGeneration
Study phase (standardized by Berkeley Lab)IA Executed
Study phase (as the queue printed it)In-Service
Queue date2005-05-25

Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.

Fields shown are those in Berkeley Lab’s data file, which standardizes each provider’s queue. The provider’s own queue may carry more fields and newer values. Always confirm against it before relying on any value.