San Juan, NM interconnection queue
4 active projects totaling 3,750 MW in the APS queue, plus 11 with terminal status (shown grayed).
4active projects
3,750active MW
15total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| Q320 | Not reported | 345 | 1,500 | Wind | Suspended |
| Q218 | Not reported | 500 | 1,200 | Other | Withdrawn |
| Q318 | Not reported | 345 | 1,000 | Wind | Suspended |
| Q319 | Not reported | 345 | 1,000 | Wind | Suspended |
| Q1 | Not reported | n/r | 700 | Coal | Withdrawn |
| Q3 | Not reported | n/r | 503.5 | Coal | Withdrawn |
| Q259 | Not reported | 345 | 400 | Hybrid | Withdrawn |
| Q577 | Not reported | 345 | 250 | Other | Withdrawn |
| Q610 | Not reported | 345 | 250 | Other | Active |
| Q178 | Not reported | 230 | 200 | Solar | Withdrawn |
| Q179 | Not reported | 230 | 100 | Solar | Withdrawn |
| Q180 | Not reported | 230 | 100 | Solar | Withdrawn |
| Q183 | Not reported | 230 | 100 | Solar | Withdrawn |
| Q181 | Not reported | 230 | 50 | Solar | Withdrawn |
| Q182 | Not reported | 230 | 50 | Solar | Withdrawn |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with APS before relying on these figures.