San Juan, NM interconnection queue

4 active projects totaling 3,750 MW in the APS queue, plus 11 with terminal status (shown grayed).

4active projects
3,750active MW
15total filed
Queue IDProjectkVMWResourceStatus
Q320 Not reported 345 1,500 Wind Suspended
Q218 Not reported 500 1,200 Other Withdrawn
Q318 Not reported 345 1,000 Wind Suspended
Q319 Not reported 345 1,000 Wind Suspended
Q1 Not reported n/r 700 Coal Withdrawn
Q3 Not reported n/r 503.5 Coal Withdrawn
Q259 Not reported 345 400 Hybrid Withdrawn
Q577 Not reported 345 250 Other Withdrawn
Q610 Not reported 345 250 Other Active
Q178 Not reported 230 200 Solar Withdrawn
Q179 Not reported 230 100 Solar Withdrawn
Q180 Not reported 230 100 Solar Withdrawn
Q183 Not reported 230 100 Solar Withdrawn
Q181 Not reported 230 50 Solar Withdrawn
Q182 Not reported 230 50 Solar Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with APS before relying on these figures.