Cochise, AZ interconnection queue
0 active projects totaling 0 MW in the APS queue, plus 10 with terminal status (shown grayed).
0active projects
0active MW
10total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| Q526 | Not reported | 115 | 110 | Hybrid | Withdrawn |
| Q29 | Not reported | 115 | 100 | Wind | Withdrawn |
| Q552 | Not reported | 69 | 75 | Other | Withdrawn |
| Q496 | Not reported | 69 | 74 | Solar | Withdrawn |
| Q166 | Not reported | 69 | 20 | Solar | Withdrawn |
| Q190 | Not reported | 12 | 20 | Solar | Withdrawn |
| Q221 | Not reported | 12 | 20 | Solar | Withdrawn |
| Q223 | Not reported | 12 | 20 | Solar | Withdrawn |
| Q231 | Not reported | n/r | 17.5 | Solar | Withdrawn |
| Q185 | Not reported | 69 | 15 | Solar | Withdrawn |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with APS before relying on these figures.