Cochise, AZ interconnection queue

0 active projects totaling 0 MW in the APS queue, plus 10 with terminal status (shown grayed).

0active projects
0active MW
10total filed
Queue IDProjectkVMWResourceStatus
Q526 Not reported 115 110 Hybrid Withdrawn
Q29 Not reported 115 100 Wind Withdrawn
Q552 Not reported 69 75 Other Withdrawn
Q496 Not reported 69 74 Solar Withdrawn
Q166 Not reported 69 20 Solar Withdrawn
Q190 Not reported 12 20 Solar Withdrawn
Q221 Not reported 12 20 Solar Withdrawn
Q223 Not reported 12 20 Solar Withdrawn
Q231 Not reported n/r 17.5 Solar Withdrawn
Q185 Not reported 69 15 Solar Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with APS before relying on these figures.