Stateline - West Point 161-kV TL substation interconnection queue

2 active projects totaling 160 MW in the TVA queue.

2 TVA queue filings name Stateline - West Point 161-kV TL as the point of interconnection, all in Monroe County, MS.

2active projects
160active MW
2total filed
Queue IDProjectkVMWResourceStatus
313 Not reported n/r 100 Solar Active
314 Not reported n/r 60 Solar Active

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with TVA before relying on these figures.