TVA request 662

TVA queue ID 662

Queue request 662 was listed in the TVA interconnection queue at the end of 2025 as a 110 MW solar project in Madison County, AL, according to Berkeley Lab’s queue data file. The filing names 161 Bus at Limestone substation as its point of interconnection. Its status as of December 31, 2025 was “Active”, with a proposed online date of April 1, 2027.

Queue ID662
Project nameNot reported
Status (as published)Active
Substation161 Bus at Limestone substation
Point of interconnection161 Bus at Limestone substation
CountyMadison
StateAL
VoltageNot reported
Capacity110 MW
Resource (as published)Solar
Resource categorySolar (normalized for filtering)
Proposed online date2027-04-01
Source datasetBerkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025

Same substation and county

Madison, AL: 1 request in the TVA queue, 1 active totaling 110 MW.

Tracked changes

Not tracked. TVA rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.

Additional filed fields

UtilityTennessee Valley Authority
ClusterTC25-059
Project typeGeneration
Study phase (standardized by Berkeley Lab)Cluster Study
Queue date2024-10-01

Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.

Fields shown are those in Berkeley Lab’s data file, which standardizes each provider’s queue. The provider’s own queue may carry more fields and newer values. Always confirm against it before relying on any value.