TVA request 660
TVA queue ID 660
Queue request 660 was listed in the TVA interconnection queue at the end of 2025 as a 99 MW solar project in Jackson County, AL, according to Berkeley Lab’s queue data file. The filing names Widow's Creek Switchyard as its point of interconnection. Its status as of December 31, 2025 was “Active”, with a proposed online date of October 30, 2032.
| Queue ID | 660 |
|---|---|
| Project name | Not reported |
| Status (as published) | Active |
| Substation | Widow's Creek Switchyard |
| Point of interconnection | Widow's Creek 161 kV Switchyard |
| County | Jackson |
| State | AL |
| Voltage | 161 kV |
| Capacity | 99 MW |
| Resource (as published) | Solar |
| Resource category | Solar (normalized for filtering) |
| Proposed online date | 2032-10-30 |
| Source dataset | Berkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025 |
Same substation and county
Jackson, AL: 27 requests in the TVA queue, 3 active totaling 430 MW.
Tracked changes
Not tracked. TVA rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.
Additional filed fields
| Utility | Tennessee Valley Authority |
|---|---|
| Cluster | TC25-057 |
| Project type | Generation |
| Study phase (standardized by Berkeley Lab) | Cluster Study |
| Queue date | 2024-10-01 |
Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.
Fields shown are those in Berkeley Lab’s data file, which standardizes each provider’s queue. The provider’s own queue may carry more fields and newer values. Always confirm against it before relying on any value.