TVA request 618

TVA queue ID 618

Queue request 618 was listed in the TVA interconnection queue at the end of 2025 as a 800 MW gas project in Stewart County, TN, according to Berkeley Lab’s queue data file. The filing names Cumberland CC SS as its point of interconnection. Its status as of December 31, 2025 was “Active”, with a proposed online date of June 1, 2027.

Queue ID618
Project nameNot reported
Status (as published)Active
SubstationCumberland CC SS
Point of interconnectionCumberland CC 500kV SS
CountyStewart
StateTN
Voltage500 kV
Capacity800 MW
Resource (as published)Gas
Resource categoryGas (normalized for filtering)
Proposed online date2027-06-01
Source datasetBerkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025

Same substation and county

Stewart, TN: 4 requests in the TVA queue, 4 active totaling 2,444 MW.

Tracked changes

Not tracked. TVA rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.

Additional filed fields

UtilityTennessee Valley Authority
Project typeGeneration
Study phase (standardized by Berkeley Lab)Facility Study
Queue date2024-06-12

Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.

Fields shown are those in Berkeley Lab’s data file, which standardizes each provider’s queue. The provider’s own queue may carry more fields and newer values. Always confirm against it before relying on any value.