TVA request 530

TVA queue ID 530

Queue request 530 was listed in the TVA interconnection queue at the end of 2025 as a 90 MW hybrid project in Pinola County, MS, according to Berkeley Lab’s queue data file. The filing names Batesville - Blue Goose TL as its point of interconnection. Its status as of December 31, 2025 was “Active”, with a proposed online date of June 29, 2028.

Queue ID530
Project nameNot reported
Status (as published)Active
SubstationBatesville - Blue Goose TL
Point of interconnectionBatesville - Blue Goose 161 kV TL
CountyPinola
StateMS
Voltage161 kV
Capacity90 MW
Resource (as published)Solar+Battery
Resource categoryHybrid (normalized for filtering)
Proposed online date2028-06-29
Source datasetBerkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025

Same substation and county

Pinola, MS: 1 request in the TVA queue, 1 active totaling 90 MW.

Tracked changes

Not tracked. TVA rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.

Additional filed fields

UtilityTennessee Valley Authority
Project typeGeneration
Study phase (standardized by Berkeley Lab)IA Executed
Queue date2023-03-07
Components (hybrid)Solar 90 MW + Battery

Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.

Fields shown are those in Berkeley Lab’s data file, which standardizes each provider’s queue. The provider’s own queue may carry more fields and newer values. Always confirm against it before relying on any value.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first