TVA request 530
TVA queue ID 530
Queue request 530 was listed in the TVA interconnection queue at the end of 2025 as a 90 MW hybrid project in Pinola County, MS, according to Berkeley Lab’s queue data file. The filing names Batesville - Blue Goose TL as its point of interconnection. Its status as of December 31, 2025 was “Active”, with a proposed online date of June 29, 2028.
| Queue ID | 530 |
|---|---|
| Project name | Not reported |
| Status (as published) | Active |
| Substation | Batesville - Blue Goose TL |
| Point of interconnection | Batesville - Blue Goose 161 kV TL |
| County | Pinola |
| State | MS |
| Voltage | 161 kV |
| Capacity | 90 MW |
| Resource (as published) | Solar+Battery |
| Resource category | Hybrid (normalized for filtering) |
| Proposed online date | 2028-06-29 |
| Source dataset | Berkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025 |
Same substation and county
Pinola, MS: 1 request in the TVA queue, 1 active totaling 90 MW.
Tracked changes
Not tracked. TVA rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.
Additional filed fields
| Utility | Tennessee Valley Authority |
|---|---|
| Project type | Generation |
| Study phase (standardized by Berkeley Lab) | IA Executed |
| Queue date | 2023-03-07 |
| Components (hybrid) | Solar 90 MW + Battery |
Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.
Fields shown are those in Berkeley Lab’s data file, which standardizes each provider’s queue. The provider’s own queue may carry more fields and newer values. Always confirm against it before relying on any value.