TVA request 514

TVA queue ID 514

Queue request 514 was listed in the TVA interconnection queue at the end of 2025 as a 200 MW battery project in Dekalb County, AL, according to Berkeley Lab’s queue data file. The filing names Widows Creek FP - Rock Spring TL as its point of interconnection. Its status as of December 31, 2025 was “Active”, with a proposed online date of September 7, 2028.

Queue ID514
Project nameNot reported
Status (as published)Active
SubstationWidows Creek FP - Rock Spring TL
Point of interconnectionWidows Creek FP - Rock Spring 230kV TL
CountyDekalb
StateAL
Voltage230 kV
Capacity200 MW
Resource (as published)Battery
Resource categoryBattery (normalized for filtering)
Proposed online date2028-09-07
Source datasetBerkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025

Same substation and county

Dekalb, AL: 1 request in the TVA queue, 1 active totaling 200 MW.

Tracked changes

Not tracked. TVA rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.

Additional filed fields

UtilityTennessee Valley Authority
Project typeGeneration
Study phase (standardized by Berkeley Lab)IA Executed
Queue date2022-08-24

Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.

Fields shown are those in Berkeley Lab’s data file, which standardizes each provider’s queue. The provider’s own queue may carry more fields and newer values. Always confirm against it before relying on any value.