TVA request 512

TVA queue ID 512

Queue request 512 was listed in the TVA interconnection queue at the end of 2025 as a 200 MW solar project in Lee County, MS, according to Berkeley Lab’s queue data file. The filing names Union - Tupelo No. 3 161-kV TL as its point of interconnection. Its status as of December 31, 2025 was “Active”, with a proposed online date of December 11, 2028.

Queue ID512
Project nameNot reported
Status (as published)Active
SubstationUnion - Tupelo No. 3 161-kV TL
Point of interconnectionUnion - Tupelo No. 3 161-kV TL
CountyLee
StateMS
VoltageNot reported
Capacity200 MW
Resource (as published)Solar
Resource categorySolar (normalized for filtering)
Proposed online date2028-12-11
Source datasetBerkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025

Same substation and county

Lee, MS: 2 requests in the TVA queue, 1 active totaling 200 MW.

Tracked changes

Not tracked. TVA rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.

Additional filed fields

UtilityTennessee Valley Authority
Project typeGeneration
Study phase (standardized by Berkeley Lab)Facility Study
Queue date2022-08-23

Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.

Fields shown are those in Berkeley Lab’s data file, which standardizes each provider’s queue. The provider’s own queue may carry more fields and newer values. Always confirm against it before relying on any value.