TVA request 476

TVA queue ID 476

Queue request 476 was listed in the TVA interconnection queue at the end of 2025 as a 18 MW hydro project in Lyon County, KY, according to Berkeley Lab’s queue data file. The filing names Barkley Power Plant as its point of interconnection. Its status as of December 31, 2025 was “Active”, with a proposed online date of February 25, 2027.

Queue ID476
Project nameNot reported
Status (as published)Active
SubstationBarkley Power Plant
Point of interconnectionBarkley Power Plant
CountyLyon
StateKY
VoltageNot reported
Capacity18 MW
Resource (as published)Hydro
Resource categoryHydro (normalized for filtering)
Proposed online date2027-02-25
Source datasetBerkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025

Same substation and county

Lyon, KY: 1 request in the TVA queue, 1 active totaling 18 MW.

Tracked changes

Not tracked. TVA rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.

Additional filed fields

UtilityTennessee Valley Authority
Project typeUpgrade
Study phase (standardized by Berkeley Lab)Facility Study
Queue date2021-04-29

Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.

Fields shown are those in Berkeley Lab’s data file, which standardizes each provider’s queue. The provider’s own queue may carry more fields and newer values. Always confirm against it before relying on any value.