Weakley, TN interconnection queue

1 active project totaling 600 MW in the TVA queue, plus 5 with terminal status (shown grayed).

1active projects
600active MW
6total filed
Queue IDProjectkVMWResourceStatus
40 Not reported n/r 600 Other Operational
116 Not reported n/r 555 Other Withdrawn
209 Not reported n/r 500 Gas Withdrawn
112 Not reported n/r 280 Other Withdrawn
615 Not reported n/r 150 Battery Withdrawn
528 Not reported n/r 120 Solar Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with TVA before relying on these figures.