0 active projects totaling 0 MW in the TVA queue, plus 6 with terminal status (shown grayed).

0active projects
0active MW
6total filed
Queue IDProjectkVMWResourceStatus
8 Not reported n/r 350 Other Withdrawn
119 Not reported n/r 320 Other Withdrawn
120 Not reported n/r 320 Other Withdrawn
60 Not reported n/r 316 Other Withdrawn
69 Not reported n/r 316 Other Withdrawn
361 Not reported n/r 175 Solar Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with TVA before relying on these figures.