0 active projects
totaling 0 MW in the TVA queue, plus 6 with terminal status (shown grayed).
0active projects
0active MW
6total filed
Queue ID
Project
kV
MW
Resource
Status
8
Not reported
n/r
350
Other
Withdrawn
119
Not reported
n/r
320
Other
Withdrawn
120
Not reported
n/r
320
Other
Withdrawn
60
Not reported
n/r
316
Other
Withdrawn
69
Not reported
n/r
316
Other
Withdrawn
361
Not reported
n/r
175
Solar
Withdrawn
A request with terminal status left the queue as filed.
That is a record of the filing, not evidence of injection capacity at this location.
Confirm deliverability with TVA before relying on these figures.
Site Scanner
Before you spend weeks on a site, spend seconds screening it.