Union, MS interconnection queue

1 active project totaling 390 MW in the TVA queue, plus 6 with terminal status (shown grayed).

1active projects
390active MW
7total filed
Queue IDProjectkVMWResourceStatus
51 Not reported n/r 750 Other Withdrawn
92 Not reported n/r 640 Other Withdrawn
175 Not reported n/r 587 Other Withdrawn
66 Not reported n/r 510 Other Withdrawn
108 Not reported n/r 500 Other Withdrawn
187 Not reported n/r 500 Other Withdrawn
17 Not reported n/r 390 Other Operational

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with TVA before relying on these figures.