Trousdale, TN interconnection queue

2 active projects totaling 2,400 MW in the TVA queue, plus 6 with terminal status (shown grayed).

2active projects
2,400active MW
8total filed
Queue IDProjectkVMWResourceStatus
621 Not reported n/r 2,405 Gas Withdrawn
626 Not reported n/r 2,405 Gas Withdrawn
619 Not reported n/r 1,600 Gas Withdrawn
620 Not reported n/r 1,600 Gas Active
564 Not reported n/r 1,224 Gas Withdrawn
565 Not reported n/r 1,098 Gas Withdrawn
622 Not reported n/r 800 Gas Active
623 Not reported n/r 800 Gas Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with TVA before relying on these figures.