Queue IDProjectkVMWResourceStatus
251 Not reported n/r 1,156 Gas Withdrawn
458 Not reported n/r 120 Hybrid Withdrawn
548 Not reported n/r 120 Hybrid Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with TVA before relying on these figures.